REALWorld Law

Planning / zoning

Designated use

Are there any legal restrictions on the designated use to which any new building may be put or on any change in the designated use of an existing building?

Netherlands

Netherlands

Permission is not required where the works or change of use are already authorized as ‘permitted development’ under the applicable (municipal) environmental plan and, if applicable, other rules and regulations. If this is not the case, a permission (specifically, an environmental permit for deviation) is required before any operational development or a material change of use can occur. Please note that other permissions could be required (ie ecology (nitrogen emissions and protected flora and fauna), waterworks or disposals and/or soil remediation works and/or for traffic routing and/or signage/advertisements).