Licences and permits

What official permissions, licences or consents are required by a building or engineering contractor before it can start work?

Slovak Republic

Slovak Republic

Unless otherwise specified by the Building Act, a decision on a construction project is required for every construction, alteration to a completed building, demolition of a building, and structural modifications to a building or land. In the case of minor constructions, a notification is required instead of a decision on a construction project, with exceptions applicable.

The application to initiate proceedings is submitted by the builder to the relevant administrative authority electronically using the designated form. The application must be accompanied by:

  • a project documentation prepared by an authorized person; and
  • a report on the discussion of the construction project.

If the application does not contain the prescribed requirements, the relevant administrative authority shall, within 15 days of receiving the application, request the builder to supplement the application within a specified period and notify him/her that otherwise the proceedings will be terminated.